Energy
Savings Payback Calculator
This sample ROI compares installing a traditional transformer
in a new building vs. an E-Factor transformer |
| |
|
|
|
|
|
Project Description: |
New Project |
|
|
|
|
Date: |
01-Nov-04 |
|
|
|
|
Data Entry |
|
|
Transformers on Project |
|
|
% Load during normal operating hours |
35% |
|
Quantity |
kVA |
|
% Load outside operating hours |
20% |
|
|
15 |
|
Equipment operating hours/day |
10 |
|
|
30 |
|
Equipment operating days/year |
260 |
|
|
45 |
|
kWh rate |
$0.06 |
|
|
75 |
|
Demand rate ($/kW/mo.) ex. $10.00 |
$5.00 |
|
1 |
112.5 |
|
Load Power Factor |
0.75 |
|
|
150 |
|
% additional cooling losses |
36% |
|
1 |
225 |
| |
|
Nonlinear Loss Multiplier |
|
300 |
|
Other transformer linear efficiency & loss multiplier |
97.5% |
2.0 |
1 |
500 |
|
E-Factor Nonlinear Efficiency |
98.0% |
|
|
other kVa |
|
| |
|
|
|
| |
|
|
|
| Energy Cost Analysis
(calc.) |
Annual |
kW Losses in |
kW Losses outside |
| |
Operating Cost |
Normal Operation |
Operating Hours |
|
Traditional Transformers |
$6,722 |
15.7 |
9.0 |
|
E-Factor Transformers |
$2,607 |
6.1 |
3.5 |
|
Annual Energy Savings with E-Factor |
$4,166 |
9.6 |
5.5 |
| |
|
|
|
|
Estimated Annual Power Quality Savings |
$2,000 |
|
|
|
| |
|
|
|
| |
|
|
|
|
Life Cylce Savings & Payback |
First Cost |
Operating |
Total Hours |
|
Traditional Transformers |
$15,700 |
$218,062 |
$233,762 |
|
E-Factor Transformers |
$25,946 |
$65,167 |
$91,113 |
|
Savings |
($10,246) |
$152,895 |
$142,649 |
|
Payback on Incremental Cost |
1.68 years |
|
|
|
| |
|
|
| |
|
|
|
Summary of Environmental Benefits |
|
|
|
Annual Reduction in Greenhouse Gases |
44 tons of CO2 |
341 Kgs of SO2 |
|
(Per EPA) |
141 tons of coal |
147 Kgs of NOx |
|
Equivalence |
8 Acres trees planted |
6 homes heated |
| |
6 Car Emissions |
|
| |
|
|
|